Engineers one - in the boiler house we have oversized thermometers on the wall at each level. And a sign that says what OHS max work times are at different temps. If your on top of the HP steam drum at the highest level work time is 10 minutes. I have never sweated so much as the one time i had to be up there with the boiler on. I was amazed at how much fluid i drank after that.
Engineers one - in the boiler house we have oversized thermometers on the wall at each level. And a sign that says what OHS max work times are at different temps. If your on top of the HP steam drum at the highest level work time is 10 minutes. I have never sweated so much as the one time i had to be up there with the boiler on. I was amazed at how much fluid i drank after that.
ReplyDeleteExile1981